Click on the toggle button above for full screen slide show
CONSTRUCTION
This page documents the construction and development of Abrams’ Tower West.
Construction began in February of 2016. On July 20, construction of the main space and upper deck was completed and a permit for its occupancy was received from the City of Los Angeles.
The canopy rooftop, which required a separate city permit of another set of architectural drawings, was installed on March 16, 2017.